2016
12 Jan 2023Our company completed some of the most important wind energy projects in Morocco, such as the Akhfenir wind farm.
New aircraft transports. As in previous years, these aircrafts must be transported with their wings separated from the airframe due to their size. This work required to be completed at night as it involved going across significant populated areas.
Multiple transports were made to the United Kingdom, such as the transportation of 6 foundations for a wind farm in Wales or 60 tonnes and 5 metre diameter autoclave to Southampton.
There were also transported 4 accumulators, each one with over 100 tonnes. Together all these transports measured more than 50 meters long.